أهلاً بك في موقعي الشخصي..
بواسطة malawwad في 19 أغسطس 2016
On April 30 1935, drilling started on test well No. 1 in Dammam. After seven months, only gas was found with traces of oil at a depth of 700 meters. So it had to be plugged. Drilling began on Dammam well No. 2 on Feb. 8, 1936, and started producing oil on June 1936 at a depth of 633 meters, with 3,840 barrels per day.
الصفحات