تجاوز إلى المحتوى الرئيسي
User Image

Dr. BOKKASAM SASIDHAR

Professor

PROFESSOR

كلية إدارة الأعمال
Building No. 67, Second Floor, Office No. S280
المنشورات
مقال فى مجلة
2023

Application of POM-QM for Windows and Multiple ARC Network Model for Scheduling in a Single-Stage, Multi-Item Compatible Process

The importance of scheduling in the industrial world is growing rapidly. Customer-driven production scheduling is the need of the hour in the present business environment. The criteria generally considered are to maximize production volume while keeping in view the customers’ requirements and not to lose focus on maximizing profits as well as maximizing machine utilization. In order to retain major customers, the customers are categorized as either priority customers or normal customers. The production planning takes into account the customers’ orders, keeping in mind the nature of customers, viz., priority or normal. A production environment involving a given set of machines in a single-stage, multi-item compatible process is considered. The problem of scheduling in such an environment, with the objective of maximizing capacity utilization has been formulated [1] as a maximal flow problem in a Multiple Arc Network (MAN). The model generates an optimal production schedule with the goal of maximizing capacity utilization, ensuring that customer-wise delivery schedules are met while keeping customer priorities in mind. Implementation of the MAN System modeling has been built using POM-QM software for Windows V5. The application of the software is demonstrated using two examples. The QM software can be used by managers for any scaled-up operations to obtain production schedules.

نوع عمل المنشور
Research Paper
اسم الناشر
Asian Journal of Advances in Research
رقم المجلد
6
رقم الانشاء
1
الصفحات
523-538
مزيد من المنشورات
publications

The importance of scheduling in the industrial world is growing rapidly. Customer-driven production scheduling is the need of the hour in the present business environment.

بواسطة Bokkasam Sasidhar
2023
تم النشر فى:
Asian Journal of Advances in Research
publications

Fixed charge transportation problem (FCTP), which can be considered as a
distribution problem, is considered to be an NP-hard problem. One of its versions is the Step Fixed
charge…

بواسطة Mahmoud M. El-Sherbiny, Ibrahim A. Aljasser, Bokkasam Sasidhar
2021
تم النشر فى:
International Journal of Advance Engineering and Research Development
publications

Service quality is a competitive weapon in the banking industry. Better understanding of customer’s perception
of service quality in the banking industry and the drivers of such perceptions…

بواسطة Ibrahim Abdullah Aljasser, Bokkasam Sasidhar
2019